Key figures (free to quote)
| Item | Reference figure |
|---|---|
| Delivery order (D/O) issuance | 1-2 working days after bill of lading arrival. |
| Telex release | 1 working day. |
| D/O fee | IDR 350,000-1,500,000 per shipment (varies by carrier; subject to current rates). |
| Java island delivery | 2-4 days. |
| Outer island delivery | 5-10 days including onward transfer. |
| Free time (detention free days) | 7 days from discharge by default (extension to 14 days can be requested). |
| Demurrage 20GP | IDR 400,000–1,050,000 per day after free time (escalating bands, ≈USD 22–58). |
| Demurrage 40HQ | IDR 700,000–1,575,000 per day after free time (escalating bands, ≈USD 39–88). |
| Free storage period at port | 3-5 days. |
Reference values for standard cases (complete documents, no inspection, outside the red-line season). Actual figures follow current carrier and customs notices. Last reviewed 2026-09-27.
Key questions on this page
How long does delivery order (D/O) issuance take?
1-2 working days after bill of lading arrival.
How many days does telex release take?
1 working day.
How many extra days does a Jakarta yellow-line inspection add?
3 working days standard + 7 working days inspection.
How many days does Jakarta red-line handling take?
3 working days standard + 10 working days red-line handling.
How many days does Semarang (Tanjung Emas) clearance take?
2-4 working days.
How many days does Surabaya (Tanjung Perak) clearance take?
2-4 working days.
Answers are reference values for standard cases; actual figures follow current carrier and customs notices (reviewed 2026-09-27).
What the D/O exchange is, and why cargo gets stuck there
An import shipment moves roughly like this: vessel arrives, D/O exchange, customs declaration (PIB / BC 2.0), duty and tax payment, inspection or release, container pick-up and delivery. The D/O exchange is the first link in that chain, and the one with the most people involved and the least uniform standards — because it is not a customs process at all. It is the carrier's commercial process, and each carrier writes its own rules.
The cost of being stuck here is immediate: for every day a container sits at the terminal, demurrage and detention charges step up, and storage in Indonesia is not cheap. That is why the first thing an experienced forwarder does is not chase the release — it is to clear every precondition before the vessel arrives.
Five steps: from receiving the documents to holding the D/O
- Identify the B/L type — original (OBL), telex release, or sea waybill (SWB). This decides whether originals have to be surrendered and whether a letter of indemnity is needed.
- Identify the required document form — originals only, scans, or electronic filing. The three forms carry different requirements, and preparing the wrong one gets the file returned as it came.
- Identify the gates — registration, letters of indemnity, telex release status, tax numbers. If one of them is not cleared, the D/O will not be issued.
- Prepare and file the documents — power of attorney, container release letter, endorsed B/L, payment receipt, each in the form that carrier requires (original / scan / electronic).
- Pay and collect — most carriers release only after payment clears. Electronic D/Os are downloaded; paper ones follow separately.
Three iron rules (they matter more than memorizing a document list)
① Identify the B/L type before you discuss documents. An original B/L needs the full set of originals, endorsed; a telex release needs a non-original release application letter with a duty stamp; a sea waybill is usually the lightest. Mix them up and the file goes straight back.
② Identify the document form before you prepare the file. Original, scan and electronic filing are three different sets of requirements. Hand in an original where a scan is called for and nothing moves — the form is checked before the content.
③ Clear the gate before you chase the release. While a precondition is unmet — telex release not confirmed, letter of indemnity not approved, tax number not supplied — chasing the release achieves nothing. Open the gate first, then chase.
Carrier documentation and timing quick-reference
The table below compiles the documentation essentials and the timing and free-time points we work to in Indonesian import practice. Click a carrier name for its full rules and its document list.
| Carrier / agent | Documentation essentials | Timing and free time |
|---|---|---|
| COSCO | LOI on the carrier's own template; NIB and signatory KTP; B/L endorsed by consignee and notify party. | Payment window closes 15:00 the same day; free time 7 days dry, 4 days reefer. |
| EVERGREEN | Power of attorney fully signed (four documents in one); NPWP matching the consignee; endorsed B/L. | File by 15:00 for same-day handling, otherwise next working day; e-DO reaches the terminal within 30–45 minutes. |
| OOCL | Endorsed original B/L (ID for a sea waybill); power of attorney; NPWP and HS code, minimum 4 digits. | Arrival notice 2 days ahead short-haul, 5 days long-haul; extension billed in USD at the daily rate. |
| MAERSK | Container guarantee letter (CGL) on the carrier's template, director-signed, on consignee letterhead, paper original; NPWP and HS code. | Release data visible 2 days before ETA; free time checked per shipment; endorsed original B/L due before arrival. |
| MSC | NPWP and HS code (min. 4 digits) mandatory; letter bundle as one file; duty stamp on each signature. | Pay within 7 days of the invoice (non-credit); disputes within 3 days; confirm telex release status first. |
| PIL | Endorsed B/L, invoice or packing list, NPWP matching the consignee; application fields: B/L number, vessel, container number, consignee. | Free time 0–7 days from arrival (ATA), calendar days incl. holidays; overstay charge steps up in bands. |
| WANHAI | LOI on the carrier's own draft, consignee letterhead, red fields unalterable; B/L wet-endorsed by consignee and notify party. | Filing cut-off 11:00, the earliest of all carriers; original B/L by 14:00; deposit refunds only Thursday 08:00–12:00. |
| GOLD STAR | NPWP matching the consignee; for refunds a consignee indemnity letter plus bank name, account and holder. | Refunds are arranged after finance review and require a complete file first. |
| TOP ASIA | All five items as paper originals, scans rejected; non-original release letter stamped; consignee signature and company stamp. | Release follows confirmed payment, after the full original set is filed and the consignee has signed and stamped. |
| SAMUDERA | e-COO in LNSW single-window format; telexed B/L with consignee's seal; SK DO sent as paper original. | A local agent handles Indonesian clearance; project work commonly runs 70% before operations and 30% on completion. |
| EMC / PENANSHIN | Six originals: collection authorization, non-original release letter with duty stamp, container letter, endorsed telex B/L, receipt, deliverer's ID. | All six items must be filed together; a missing item means a second trip. |
| BVL | NPWP matching the consignee; NITKU before the tax invoice is issued; PPH 23 certificate filed with payment. | Invoices are locked once confirmed; PPH 23 certificate due within 2 months of the invoice date. |
| CHINA COAST | Original exchange documents as paper originals; invoicing details for a tax invoice; LCL follows the same route. | Originals are reviewed within a day or two; release follows receipt and cleared payment; no rush requests. |
| TRANSHUBINDO | Extension needs payment proof plus the old D/O; deposits refund only to a matching account name. | Payment before 14:00 handled the same day; extension is demurrage for actual days plus a fee including VAT. |
| KMTC | Guarantee letter, power of attorney and covering letter in one carrier-template set; director's ID copy; NPWP. | Extension of the D/O is charged at a fixed rate per B/L number. |
Note: documentation requirements and deadlines can differ by port (Jakarta / Semarang / Surabaya) and are revised from time to time. Always confirm against the carrier's current notice.
Carrier-by-carrier detail
Pitfalls we have already hit for you
- Duty stamps (materai) are not a formality: several letters require a duty stamp once the amount passes a threshold, and a missing stamp gets the file returned outright.
- Original B/Ls have to be in before the vessel arrives: some carriers state that the endorsed original must be delivered before arrival — a day late is a day of storage.
- Free time starts differently from carrier to carrier: some count from discharge, some from container pick-up, and some from arrival date on calendar days including holidays. Count on the wrong basis and your free days shrink by several days on paper.
This page compiles public rules and carrier practice from Indonesian import work. It is for business reference only and does not constitute legal, customs or pricing advice. Carriers' documentation requirements, timelines and fees change continually, so the carrier's current notice and official announcements always govern. Carrier bank details and specific rates are not listed here — refer to the carrier's invoice. PT SHOULDER International Logistics · Licensed PPJK · Jakarta / Semarang · China side: Wuhan Freedom International Logistics Co., Ltd..
Official sources
Independently verifiable channels below. Rates, restrictions and lead times follow each agency's latest publication.
- Directorate General of Customs and Excise (Bea Cukai) — Clearance process, PIB filing and customs rules
- Indonesia National Single Window (INSW) — Unified platform for Indonesia import/export filing, licensing and documents
- Ministry of Trade (Kemendag) — Import/export licensing, Lartas restrictions and trade rules
- Pelindo (Indonesia port operator) — Port operations, terminals and vessel schedules