Reefer cargo is billed by the container and lost by the hour. Set the temperature one degree wrong, skip a step in pre-cooling, or discover a power failure a day late, and the loss can exceed the whole freight bill. This page sets out all three links of the cold chain — before loading (pre-cooling and parameter setting), in transit (power and monitoring) and on arrival (fast lift-off) — plus the mistake list that matters most on the Indonesia lane.

Updated 2026-09-22Reefer & special equipmentLicensed PPJK in Indonesia

Key figures (free to quote)

ItemReference figure
Jakarta (Tanjung Priok) standard clearance2-4 working days (complete documents, no inspection).
Jakarta inspection (yellow line)3 working days standard + 7 working days inspection.
Jakarta red line3 working days standard + 10 working days red-line handling.
Inspection profile (empirical)Yellow line about 10-20%, red line about 3-5% (not official; varies by year and category).
PPN (VAT)Statutory 12%; computed on an 11/12 base, so about 11% effective for non-luxury goods.
PPh 22 (with API)2.5% of the import value.
PPh 22 (without API)7.5%; a further 100% surcharge applies where no NPWP tax number is held.
Import duty (BM)Commonly 0-15% depending on the HS code; FORM E / ACFTA brings most lines to 0%.

Reference values for standard cases (complete documents, no inspection, outside the red-line season). Actual figures follow current carrier and customs notices. Last reviewed 2026-09-27.

In short

1. Temperature, ventilation and humidity: how the parameters are set

Parameters are provided by the cargo owner according to the nature of the goods, and the unit is set and re-checked by a qualified operator; unit capability varies, so the equipment’s technical condition at the time governs.

ParameterSetting logicCommon mistake
Set temperatureFixed to the cargo requirement; frozen and chilled run on completely different logicOne habitual setting for everything, without reading the cargo requirement
Temperature tolerance bandSet to the range the cargo allowsOpening the band so wide it amounts to no temperature control at all
Fresh-air ventRespiring fruit and vegetables need the opening set to cargo and voyageOpening the vent on chilled meat and losing cooling; or leaving closed a vent that should be open
HumiditySome produce and dry cargoes carry a humidity requirementIgnoring humidity, causing dehydration or mould
Dehumidification modeEnabled according to unit capability for high-humidity cargoLeaving it off, so condensate soaks the packaging

2. Pre-cooling: why it cannot be skipped

The test: at loading, the cargo temperature should already be close to the set temperature. If the cargo is visibly warmer than the setting when it goes in, the shipment is in debt from the first step — and every later link is paying it back.

3. Power loss and monitoring: managing risk in transit

4. Handling on arrival

5. Common mistakes

MistakeConsequenceThe right way
Loading without pre-coolingThe unit chases temperature all voyage and can still arrive over the limitLoad only once cargo temperature is on target, and record it
Opening the vent on chilled cargoCold air escapes, temperature runs awaySet the vent by cargo type; ask if unsure
Watching the sea leg and ignoring the destination waitYard power loss or a long wait causes damageLine up the lift-off actions before arrival and compress yard time
Not pulling or keeping the temperature recordNo evidence when a dispute arisesPull and file it once before and once after arrival
Using an ordinary truck for the last mileThe chain breaks on the final kilometreUse a temperature-controlled vehicle and record the handover temperature
Mixing reefer LCL with general cargoTemperature and odour cross-contaminationReefer cargo goes FCL as a rule; do not consolidate it with general cargo
Ask about this shipment Estimate duty & delivery Check HS code & Lartas

Related pages

Choosing 20GP / 40GP / 40HQContainer Stuffing PlanCustoms Clearance TimelineDemurrage, Detention & StorageMarine Cargo InsuranceThe Compliance ChecklistIndonesia Import Guide

This page summarizes field practice and publicly available Indonesian import rules for general business reference only—it is not legal, customs, or pricing advice. Customs provisions, tariff rates, and licensing requirements keep changing, so the rules in force at the time and the official processing result always prevail. Wuhan Freedom International Logistics Co., Ltd. · Licensed PPJK in Indonesia · Jakarta / Semarang / Wuhan.

Frequently asked questions

What is the difference between frozen and chilled settings?

Frozen cargo is normally held at a fixed low temperature with no tolerance, on the logic of “freeze through and hold”; chilled cargo is held in the range above zero, and some fruit and vegetables also need the fresh-air vent open. The logic differs, so the parameters must be set per shipment to the cargo requirement — habitual values will not do.

Why is pre-cooling essential?

A reefer unit is designed to maintain temperature, not to pull it down. Cargo entering the box carrying field heat or residual process heat leaves the unit chasing temperature for the whole voyage, and if it cannot catch up, the cargo is damaged. Pre-cooling brings the cargo and its packaging close to the set temperature before loading, so the unit only has to maintain.

What is the fresh-air vent for?

Respiring fruit and vegetables keep producing carbon dioxide and heat in transit, which needs a small amount of outside air exchange to carry away. Opening the vent costs some cooling efficiency, so the opening is set by cargo and voyage. Chilled meat, poultry and seafood are normally carried with the vent closed. If unsure, follow the cargo technical requirement.

If the power goes off, is the cargo certainly ruined?

Not necessarily — it depends on how long the outage lasts, the ambient temperature and the cargo type. But the response must assume the worst: demand repair immediately, pull the temperature record to assess the impact, and arrange lift-off as soon as possible. The faster it is handled, the more contained the loss and the more complete the evidence of responsibility.

How is the destination wait compressed?

By moving the clearance actions forward: documents ready before arrival, declaration filed the moment the vessel is in, payment arranged immediately once the duty notice issues, and the truck and cold store booked in advance. Yard time for temperature-controlled cargo should be managed by the hour, not by the day.

Can reefer cargo be consolidated (LCL)?

In principle it is not advised. Consolidation involves waiting for other cargo and de-stuffing for onward sorting, which makes the temperature chain hard to control end to end, and different cargoes may have conflicting temperature and odour requirements. Reefer cargo goes FCL, where temperature, ventilation and handover are all under your own control, with a far smaller exposure.

Where do we get the temperature record?

Most reefer units log temperature, and the record can be pulled by container number through the carrier or the destination agent. Pull and file it once before and once after arrival. That curve is the direct evidence for judging whether the sea leg had a temperature anomaly and for dividing responsibility.

On arrival we find a temperature anomaly. What is the first step?

Secure the evidence before moving the cargo: pull the temperature record, photograph the condition of the goods, notify the carrier and the insurer, and arrange a joint survey if needed. Once the cargo is hauled away the on-site conditions change and establishing responsibility becomes sharply harder. Lifting and disposal come after the evidence is secured.