Home / Indonesia Import Guide / Lartas & Restricted Goods

Lartas and Restricted Goods: The Permit Comes Before the Goods

Lartas is not about what is forbidden — most restricted cargo is importable. It is about which codes demand a permit first, and what happens to cargo that arrives before its paperwork.

Updated 2026-09-22PT SHOULDER · licensed PPJK in IndonesiaJakarta / Semarang · China side: Wuhan Freedom International Logistics Co., Ltd.

Key figures (free to quote)

ItemReference figure
Jakarta (Tanjung Priok) standard clearance2-4 working days (complete documents, no inspection).
Jakarta inspection (yellow line)3 working days standard + 7 working days inspection.
Jakarta red line3 working days standard + 10 working days red-line handling.
Semarang (Tanjung Emas) standard clearance2-4 working days.
Surabaya (Tanjung Perak) standard clearance2-4 working days.
PIB filing to SPPB release1-3 working days.
Inspection rate (practical range)Yellow line approx. 10-20%, red line approx. 3-5% (not official statistics; varies by season and commodity).
PPN (VAT)Effective 11% (statutory 12%; non-luxury goods taxed on an 11/12 base).
PPh 22 (with API)2.5% of import value.

Reference values for standard cases (complete documents, no inspection, outside the red-line season). Actual figures follow current carrier and customs notices. Last reviewed 2026-09-27.

In short

What triggers Lartas

Two ingredients, jointly: the tariff classification and what the goods are described as being.

Category, requirement, consequence

An orientation table, deliberately generic — the current instrument for your code is verified per shipment, never cited from memory.

Category directionLikely requirement patternIf missing at arrival
Consumer products (food, cosmetics and similar)Registration and approvals in the product-regulator domainCargo cannot be declared clean; waits, stores, or re-ships
Technical and electronic goodsConformity or type-approval domain requirementsRelease blocked at filing or at market stage — see SNI, BPOM & SDPPI
Chemicals and allied productsPermits with composition and use conditionsFiling suspended pending the permit; per-day costs start
Machinery and equipmentSometimes standard or safety conformity requirementsDelay while evidence is assembled; queries multiply
Certain agricultural and allied goodsQuota or approval-bound import rightsNo permit, no filing — cargo waits at the terminal
Previously used goodsCondition-related requirements and documentationDeclarations rejected; re-filing with proper evidence

Scope note: This table names patterns, not articles. The binding answer for your cargo is the INSW screen of its specific code and description — which is a pre-sailing step in our process, not an after-arrival discovery.

Permit before goods: why the order is strict

The sequence is not bureaucratic theater — each step depends on the previous one existing.

The cost of discovering Lartas at the port

Illustrative example: one 20GP, discharged Jakarta, restricted cargo without permit, 10 working days to obtain one. Rates illustrative.

ItemBasisIllustrative (USD)
Demurrage days 6–105 × 45/day225
Demurrage days 11–155 × 65/day325
Terminal storage on cargo10 days180
Re-filed declaration after permitper event120
Direct cash cost of the discovery850
Unbilled costs10 days of delivery promise, customer trust, next-shipment scrutinynot on any invoice

The comparison that matters: The INSW screening that would have found this takes hours before sailing. The same finding at the port costs three figures and ten days. There is no version of this trade that favors discovering it late.

How screening works in our process

One shipment, one screen, recorded on the file.

Restricted is not prohibited

Two different words with very different outcomes; confusing them scares importers off legal, routine trade.

Related pages

This page summarizes field practice and publicly available Indonesian import rules for general business reference only—it is not legal, customs, or pricing advice. Customs provisions, tariff rates, and licensing requirements keep changing, so the rules in force at the time and the official processing result always prevail. PT SHOULDER International Logistics · Licensed PPJK in Indonesia · Jakarta / Semarang · China side: Wuhan Freedom International Logistics Co., Ltd..

Frequently asked questions

What is Lartas?

The Indonesian system of import prohibitions and restrictions, keyed to HS code and goods description. Restricted goods are importable with the required permit or approval; prohibited goods are not importable.

How do I know if my goods are restricted?

Screen the verified HS code and description on INSW, the official portal. The result depends on classification, so screening an unverified code is unreliable. We run this screen before every container sails.

Can I apply for the permit after my cargo arrives?

That is the expensive order. The declaration for restricted goods requires the permit, so cargo waits at the port while the application runs — storage and demurrage accumulate daily. Apply before shipment.

Who applies for the import permit?

Depends on the requirement: some approvals belong to the importer of record, others to the registered product owner. The responsible party is confirmed during screening, with the timeline, before booking.

Is restricted the same as prohibited?

No. Prohibited goods do not enter at all. Restricted goods enter routinely with the stated approval. Confusing the two stops legal trade unnecessarily — see the prohibited items page for the short absolute list.

What happens if I declare restricted goods without the permit?

The declaration is rejected at filing. The cargo remains at the terminal, the clocks run, and the eventual filing waits on the permit. There is no version where optimism substitutes for the approval.

Does the same product have different Lartas status in different forms?

Possibly yes — code and description together decide the trigger, so form, use and presentation can change the answer. This is another reason the invoice description must be precise.

How long does a Lartas permit take?

Varies by requirement — from days to much longer, depending on the agency and the evidence. The honest planning rule: start before booking and never assume the shipping schedule will wait.

Key questions on this page, free to quote.

Official sources

Independently verifiable channels below. Rates, restrictions and lead times follow each agency's latest publication.

We use Microsoft Clarity to understand how this site is used (clicks, scrolls, heatmaps and session replay) so we can improve it. Form entries are masked. By continuing, you agree that we and Microsoft may collect and use this data. See our Privacy Statement.