Key figures (citable)
| Item | Indicative |
|---|---|
| Cargo type | Cement plant and wind-power equipment |
| Common discharge ports | Ambon, Jayapura, Sorong, Pontianak |
| Project-cargo threshold | Oversized units (length >12 m) or heavy units (>26 t), project equipment |
| Port coverage | Covers 37 destination ports |
| Last reviewed | 2026-09-28 |
What this cargo is on this lane
Complete cement plant equipment, wind blades and tower sections are textbook project cargo: many pieces, oversize individual units, long delivery programmes, and destinations that are often thinly served by commercial capacity. This is not a matter of finding one ship but of sequencing a fleet — decide which pieces arrive first and which follow, then work backwards through the sailing schedule.
How this shipment actually moves
Fix the delivery sequence before discussing capacity: what the civil works need first, what erection needs first, and sequence the pieces against site progress. Oversize units move as individual breakbulk lifts while regular pieces go into containers on the same vessel, and running both legs together is what keeps the site from idling. Check the destination's capacity tier first: ports on the commercial liner rotation move by liner, others only by breakbulk vessels and subsidised freight routes, with waiting time confirmed against the current rotation.
How to measure it (beyond the four figures that set the mode)
| What to measure | How and why |
|---|---|
| Longest single unit | Longest blade, tower section or kiln shell ring — decides deck or in-hold |
| Heaviest unit | Heaviest piece, usually a kiln shell, mill or nacelle |
| Total pieces, tonnage and volume | Counted from the equipment manifest and split again per batch when phased |
| Delivery sequence and site progress | What arrives first, what follows, working backwards through the schedule |
| Destination capacity tier | Whether the port is on the commercial liner rotation, which decides liner or subsidised service |
Common discharge ports and capacity tiers
| Port | Tier and capacity |
|---|---|
| Ambon | B · Deep-sea mainline · Commercial service available, usually via Surabaya · Weekly to fortnightly, per rotation |
| Jayapura | B · Deep-sea mainline · Commercial service available, usually via Surabaya · Weekly to fortnightly, per rotation |
| Sorong | B · Deep-sea mainline · Commercial service available, usually via Surabaya · Weekly to fortnightly, per rotation |
| Pontianak | A · Commercial mainline · Container liner service, carries general cargo · Several sailings weekly — wait negligible |
Where this cargo most often goes wrong
- Finding the ship before sequencing the pieces: when the schedule shifts, site cranes and crews idle, and that costs far more than any freight difference.
- Not checking the destination's capacity tier: quoting liner service to a port that is not on the rotation is worthless however cheap it looks.
- Leaving the waiting-time band out of the quotation: for project cargo the most expensive time cost is waiting for a sailing, not the voyage, so fixing that line is what makes reconciliation possible.
Questions to settle before quoting (the ones from the parent page that matter most here)
- Origin and destination, plus discharge conditions at destination (shore crane available?)
- Door-to-door or port-to-port — is collection and delivery included at each end?
- Is it time-critical? Slow and fast services are priced apart, often by more than half
- What is the minimum shipment size? It differs per carrier — always ask for small lots
- Billed per kilogram or per cubic metre? Write "W/M, whichever greater" into the quote
Frequently asked, standard answers
What if the destination has no shore crane?
Use the ship’s gear or hire a crane locally. Who supplies the equipment and bears waiting time must be fixed in the quote, otherwise charges appear after the cargo lands.
Do you accept small breakbulk lots?
Yes. You do not need to fill a container; we accept general cargo lots and fit them to the current sailing. Minimum sizes differ by carrier — confirm before booking.
How is breakbulk billed?
Per kilogram or per cubic metre, W/M whichever greater. Minimum shipment sizes and conversion ratios differ by carrier, so ask item by item. Rates are passed through at the carrier’s tariff in force.
Does project cargo always need a full charter?
It depends on whether individual dimensions and weights exceed the thresholds on the parent page: if they do, it moves by full charter or barge case by case; regular pieces below the threshold can share the same vessel in containers without chartering the whole ship.
What is the cheapest way to phase a complete plant?
Work backwards from the erection sequence: pieces needed first take the nearest sailing, the rest follow. Phasing beats holding cargo at the load port for one full shipment and does not swamp site storage.
How long is the wait for a sailing at an outer-island project port?
Given as a band by the destination's capacity tier, with actual timing per the carrier's current rotation. We write the band into the quotation rather than offering a neat number of days.
Official sources
Channels below can be checked independently. Rates, supervision and working times follow each authority's latest notice.
Next step
Finding the ship before sequencing the pieces: when the schedule shifts, site cranes and crews idle, and that costs far more than any freight difference. Send us unit dimensions and weight, piece count, origin and destination, whether door delivery is needed and how urgent it is. We return the mode call, the destination's capacity tier, whether transhipment applies, the waiting band and the questions to settle.