Home / Indonesia Import Guide / Vessel Schedule Checks

How to Check Vessel Schedules and Voyage Details for Indonesia Routes

The dates on a schedule are a plan, not a promise. Checking them has one purpose: to keep that plan aligned with your own document chain and clearance chain, and to be the first to hear when it moves. It needs no specialist knowledge — only a fixed set of fields, a fixed set of channels and a fixed rhythm. What is genuinely dangerous is not a few days of slippage but the pair that always arrives together: a cancelled voyage and a box that has to be re-booked onto another ship, dragging documents, declaration timing and destination arrangements along with it.

Updated 2026-09-22Process & lead timeLicensed PPJK in Indonesia

Key figures (free to quote)

ItemReference figure
Ocean freightMarket-driven; must be quoted live by the carrier for the period (whether THC is included depends on the quotation).
Cut-off (CY)Release slip closes 2-3 days before sailing.
Gate openingContainers accepted from 4-5 days before sailing.
De minimis thresholdGoods valued below USD 3 are exempt from duty (PPN still applies).
NIB / API processingNIB 1-2 working days; import licence (API) 3-7 working days.
LS survey (Laporan Surveyor)3-7 working days (including issuance).
FORM E issuance1-3 working days (issued by Chinese customs / CCPIT).
Jakarta city delivery1-3 days after customs release.
Java-wide delivery2-4 days.

Reference values for standard cases (complete documents, no inspection, outside the red-line season). Actual figures follow current carrier and customs notices. Last reviewed 2026-09-27.

In short

1. Which fields to watch: the field-by-field list

FieldWhat it meansWhat to check
Vessel / voyageThe ship and sailing that actually carry the cargoMust match the booking confirmation and the bill of lading; after a re-vessel the new vessel and voyage govern
ETD (estimated departure)Cast-off time at the port of loadingNote that it is estimated; the CY cut-off usually falls one to several days before ETD
ETA (estimated arrival)Berthing time at the port of destinationDrives when free time starts and how clearance is scheduled — prepare against the ETA
CY cut-offDeadline for laden containers to enter the terminalMiss it and the box sails on nothing, however ready the cargo is
SI cut-offDeadline for bill of lading instructionsMissing it causes a re-booking or an amendment — the most common self-inflicted wound
Direct / transshipmentWhether the box changes ship en routeTransshipment depends on the on-carriage connection and the total voyage — see the transshipment page
Port rotationThe order in which ports are calledThe same trade lane with a different rotation can differ by days

2. Where to check: channels by layer

3. Cancellation and re-vessel: the knock-on list

Knock-on problemWhy it is dragged inWhat to do
Laden box in the terminal but not loadedCancellation leaves the container sitting in portConfirm the re-booked voyage and the terminal entry validity window, avoiding a second gate-in charge
BL instructions and issuance out of stepThe SI cut-off moves with the new voyageRe-arrange the instructions against the new cut-off to avoid an amendment
Certificate of origin out of step with the scheduleThe certificate’s transport information no longer matches the actual shipmentFor a large change, confirm the treatment with the issuing body as early as possible
Declaration and gate-in re-sequencedThe export declaration is re-dated to the new sailingTell the broker at once; do not let the old schedule keep holding declaration resources
Destination clearance re-scheduledA change in ETA moves when free time startsRe-align clearance and delivery to squeeze out idle time after arrival
Contract delivery date knock-onAll of the above accumulates into one delayTell the downstream side early; negotiating is cheaper than concealing

4. The checking rhythm: what to look at, and when

MomentWhat to look atWhy
At bookingVessel / voyage, ETD, CY and SI cut-offs, direct or transshipmentAlign the schedule chain and the document chain in one pass
A few days before sailingWhether the ETD has moved; whether any cancellation notice has been issuedLeave reaction time for re-booking and re-sequencing the documents
After sailingActual cast-off, vessel movement, the on-carriage connectionConfirm the voyage has genuinely started
Before arrivalETA updates and the destination arrangementsSchedule clearance and delivery against the latest ETA and cut exposure beyond free time

5. Wiring schedule checks into the whole chain

Ask about this shipment Estimate duty & delivery Check HS code & Lartas

Related pages

Booking Lead TimeDirect Call vs TransshipmentTransit TimesDemurrage, Detention & StorageChina to Indonesia ShippingBooking to DeliveryCargo TrackingIndonesia Import Guide

This page summarizes field practice and publicly available Indonesian import rules for general business reference only—it is not legal, customs, or pricing advice. Customs provisions, tariff rates, and licensing requirements keep changing, so the rules in force at the time and the official processing result always prevail. Wuhan Freedom International Logistics Co., Ltd. · Licensed PPJK in Indonesia · Jakarta / Semarang / Wuhan.

Frequently asked questions

What is the difference between ETD and ETA?

ETD is the estimated departure (cast-off) time and ETA the estimated arrival (berthing) time. Both are estimates and roll forward with actual conditions. The CY cut-off normally falls before the ETD, so plan gate-in backwards from the cut-off rather than from the ETD.

What is the difference between the CY cut-off and the SI cut-off?

The CY cut-off is the deadline for laden containers to enter the terminal — miss it and the box does not sail. The SI cut-off is the deadline for bill of lading instructions — miss it and you trigger a re-booking or an amendment. They are different steps at different moments and must be checked separately; conflating them is the most common mistake.

Where can I see the latest information if the schedule slips?

The carrier’s and booking party’s written notice is authoritative, and carrier websites track by bill of lading or booking number. Public platforms are useful reference, but where they conflict with the formal confirmation the carrier’s position wins. Asking at the important milestones is more reliable than waiting to be told.

What does “cancellation” (re-vessel) mean?

It means the voyage originally scheduled is cancelled or adjusted and the cargo is re-booked onto another voyage. The knock-on is wide: containers already gated in, documents prepared to the old schedule, the declaration rhythm and the destination schedule all have to be re-sequenced. That is why you keep watching for cancellation notices between booking and sailing.

Are re-vessel and cancellation the same thing?

They often occur together but differ: cancellation means this voyage is not sailing, re-vessel means a different ship performs it. The effect on the shipper is similar — the vessel and voyage change, so documents and the time chain must be re-sequenced. The handling principle is identical: work from the new written confirmation and tell every party quickly.

How do I calculate the voyage time accurately?

Look at the actual port rotation and whether the box transships, not just at the two end ports. The same trade lane calling at a different number of ports can differ by several days, and transshipment adds the waiting time for the on-carriage connection. Calculate from the specific voyage on the confirmation rather than forcing an experience-based number onto it.

If the schedule changes, must the certificate of origin be re-issued?

It depends on the size of the change and what the certificate requires about transport information. Minor shifts usually do not matter; a large re-dating or a change of vessel may raise a mismatch between the certificate and the actual shipment. Confirm the treatment with the issuing body as soon as the change appears — leaving it until after shipment closes most of the available options.

Who needs to be told when the ETA moves?

At least three lines: the destination clearance agent (to re-schedule the declaration and inspection expectations), the consignee or last-mile delivery (to adjust the receiving arrangements), and your internal free-time ledger (because the cost exposure restarts). Synchronise once per ETA change rather than saving it all up until arrival.

Official sources